Technical resource on zinc sealing, dehydrogenation and fastener corrosion WeChat magnet-01 · info@guass8.com
Home / Process
PROCESS

The process route decides more than the chemistry does

From plating to packing there are six steps. The order of the last two — dehydrogenation and sealing — is the decision that determines whether a high-strength part keeps its corrosion resistance.

Aluminium EV drive housing with high-strength fasteners
EV drive housings: high-strength fasteners, tight corrosion budgets and a bake that cannot be skipped.

1 · Degrease and pickle

Hydrogen enters the steel here as well as in the plating bath. Acid strength, time and temperature all matter; over-pickling is a common cause of problems that only appear weeks later.

2 · Electroplate

Zinc or zinc-nickel. Thickness distribution across the part — edges, threads, recesses — sets the upper limit of achievable salt spray, no matter what is applied afterwards.

3 · Rinse

Static rinse water accumulates zinc, iron and passivation drag-in and deposits it back on the part. Counter-flow and conductivity-based dumping are the controls.

4 · Passivate

Trivalent blue-white, yellow or thick film. Film integrity and colour uniformity are set here; sealing cannot repair a damaged passivation layer.

5 · Seal

Barrier film, typically 1–3 µm. Film weight, coverage at thread roots and drying behaviour determine whether the barrier is continuous.

6 · Dehydrogenate (if required)

190–220 °C for 4–24 h, started within hours of plating. If the sealer was applied before this step, it must survive the temperature.

Four possible routes — and what each one costs

RouteAdvantageCost / risk
Seal → bakeOne thermal step, shortest lead time, film applied to a clean passivated surface. Sealer must be rated for the bake. If it is not, salt-spray performance drops after dehydrogenation.
Bake → sealSealer never sees the bake; wide choice of chemistry. Bare parts are handled and stored between steps; surface oxidation can reduce film adhesion.
Bake → seal → cureBest film integrity; sealer fully cured. Two thermal steps: energy, handling, lead time. Cure temperature must not undo the bake.
High-temperature sealer, single stepSeal first, then dehydrogenate; the film retains corrosion resistance through the bake. Requires a datasheet statement to that effect. Not every "high temperature" product is one.
The trap: a sealer described as "high temperature" may only mean its curing temperature is high. What the part needs is a film that still protects after the bake. Ask for paired salt-spray data, before and after, on the same substrate.

Where the process most often leaks

Racking and contact marks

Every contact point is a place with no coating and no film. Rotate rack positions and inspect the marks before blaming the chemistry.

Drip time and orientation

Thread roots, blind holes and overlapping faces are where the film is thinnest. Racking orientation is cheaper to change than concentration.

Oven uniformity

Set-point is not part temperature. Loading density can leave a 20–30 °C spread; the coldest part may never reach the specification.

Packing while warm

Condensation inside a closed carton produces white rust in transit — the most common "the sealer failed" claim that has nothing to do with the sealer.

Want a second opinion on your process route?

Describe the sequence you run today — bake before or after sealing, and at what temperature.

Ask about your route
Disclaimer: this is an independent technical resource. Parameters are quoted from published product datasheets (TDS) with sources named, and are not extrapolated. Results vary with substrate, coating thickness, passivation system and equipment; validate any process change on a small batch first. We do not provide product quotations or sell chemicals.